SAROVA

Quality Assurance

A pair either meets the specification, or it never leaves the building.

Quality is not an inspection at the end of the line. It is four gates, each with a written criterion and a recorded result.

  1. GATE 01

    Incoming Material Control

    Leather, textile and component batches are inspected and recorded against the approved specification before release to the line.

    Recorded
  2. GATE 02

    In-Line Inspection

    Stitching, lasting and bonding stations carry their own acceptance criteria; non-conforming units leave the line immediately.

    Recorded
  3. GATE 03

    Physical Testing

    Flex, bond strength, abrasion and colour-fastness testing applied to sampling plans per production lot.

    Recorded
  4. GATE 04

    Final Audit

    AQL-based final inspection, metal detection and packing verification before the shipment is released.

    Recorded

Laboratory

What we physically test.

Flex resistance

Upper and sole unit cycled to detect cracking and bond fatigue.

Bond strength

Peel testing on the sole-to-upper joint against the approved threshold.

Abrasion

Outsole compound wear measured under load.

Colour fastness

Rub and light exposure testing on finished uppers.

Dimensional check

Graded sizes measured against the released last specification.

Metal detection

Every pair passes detection before cartonisation.

Certificates and audit reports are published as they are confirmed.

View certifications