SAROVA

The Factory

One roof. Every stage. No sub-contracted judgement.

Panoramic view of the SAROVA footwear production facility

Development, cutting, stitching, lasting, laboratory testing and packing sit in one building — so a decision taken at the last never gets lost in transit.

A

Cutting Hall

Automated die and knife cutting with hide-defect mapping. Panels are nested for yield and tagged to their lot on release.

Premium leather, technical knit and sole components staged for cutting
B

Stitching Cells

Computer-controlled and hand-guided cells run in parallel. Each station carries its own acceptance criteria and inspection point.

Stitching and hand-finishing detail on a premium leather upper
C

Lasting & Assembly

Heat-set lasting, sole preparation and bonding under logged pressure, temperature and cure time before the pair is released to finishing.

Lasting and assembly stations on the SAROVA production floor

Capacity

Figures on request.

Line capacity, MOQ and lead time are quoted against a specific construction and size run rather than published as a headline number.

Construction types

Formal · Sneaker · Performance · Safety

Development

Last, pattern, prototype, grading in-house

Testing

Flex, bond strength, abrasion, colour-fastness

Output

Quoted per construction and size run

Visits are arranged for qualified projects.

Request a visit